The Safonovo Industrial Park
The Park territory is ready for the industrial facilities constructioфn.
Off-site high-pressure gas network, as well as watear and sewerage networks were
put into operation. There have been built 2 km of the highway. The construction
of the main transformer substation PS 110/10 kW with the capacity of 26 MW will
be completed in 2020 The Safonovo Industrial Park infrastructure will be fully
put into operation in 2021